Perma Ballast® Installation

BTI: Experienced, Versatile, Efficient

Installation

Since 1983, BTI has installed more than 462,000 net tons of Perma Ballast® worldwide. 
  • Perma Ballast® raw material is mixed with water and pumped into the vessel using a combination of rigid and flexible piping.  

  • Our products are engineered to assure even distribution of the Perma Ballast®  material around projections and pipes, and through openings to ensure that no void areas remain. 

  • Excess water is removed while the Perma Ballast® is installed and settles, and the in-place product becomes a dense mass that will not move or shift.

© 2018 by Ballast Technologies, Inc. Proudly created with Wix.com

Ballast Technologies, Inc.,  4620 S. Coach Drive, Tucson, Arizona 85714-3442, USA

Tel: +1 520-790-2229, Ext.213, sales@ballasttech.com

  • Facebook Social Icon
  • Twitter Social Icon
  • LinkedIn Social Icon